A GPU cloud rents accelerators by the hour, by the block of days, or by the multi-year contract. On paper it is the same business as renting virtual machines: a catalog of instance types, a meter, a placement decision and an invoice. In practice almost every assumption of the general-purpose cloud breaks. The unit is an eight-GPU server or a 72-GPU rack, not a slice of a host; the network between servers is a second, dedicated fabric that matters as much as the GPUs; a single rack draws more power than a row of ordinary racks and needs liquid cooling; supply is scarce enough that providers ration it with reservations, queues and prices that change with demand; and the chips themselves are export-controlled, so who may rent them, and from where, is a licensing question.

The market has four kinds of seller. The hyperscalers (AWS, Azure, Google Cloud, Oracle) sell GPU instances next to everything else they sell, and invented time-boxed reservation products to ration them. The neoclouds (CoreWeave, Nebius, Lambda, Crusoe, Together AI and others) do little but GPUs, financed by multi-year take-or-pay contracts with a few very large customers. Marketplaces and community clouds (Vast.ai, RunPod's Community Cloud) rent other people's machines at host-set prices. And serverless GPU and inference platforms (Modal, Replicate, fal, Cloudflare Workers AI) sell GPU-seconds or outputs (an image, a second of video, a million tokens) instead of machines. Web hosts sit at the far end, selling AI site builders metered in credits on top of someone else's models.

This chapter owns GPU hourly prices and the neocloud business. It covers how GPU clouds got here, how a GPU instance and cluster work, how capacity is bought, the dated prices, the neocloud financing model, the bitcoin miners that became AI landlords, serverless and per-output pricing, rack power, export controls on chips and remote access, the AI products web hosts sell, and the tables that model GPU reservations on top of the core data model. Where a model should run, given these prices, is the next chapter, Where AI Runs: Home, Colo, Cloud or Frontier. The fabrics themselves (InfiniBand, RoCE, NVLink) are Data Center Networking's, and the general commitment math (Savings Plans, committed use discounts, spot) is Commitments, Discounts & Marketplaces'. Idle GPU waste as a cost line is the playbook's Cost & FinOps and Compute Isolation and Cost.

How the Providers Do It#

Provider Kind How it sells GPUs, as of October 2026 Fabric, as publicly described
AWS Hyperscaler On-demand and Savings Plans; EC2 Capacity Blocks for ML: 1 to 64 instances for up to six months, booked up to eight weeks ahead, at dynamic prices Ethernet with EFA and the SRD transport; 3,200 Gbps per 8-GPU P5 instance, 28.8 Tbps per GB200 UltraServer
Azure Hyperscaler Pay-as-you-go, reservations and Savings Plans; on-demand capacity reservations, but not for ND-series or NCads H100 v5 InfiniBand on ND-series: a 400 Gbps Quantum-2 link per GPU, 3.2 Tbps per VM
Google Cloud Hyperscaler On-demand, committed use; Dynamic Workload Scheduler: Flex Start (queued) and Calendar mode (fixed blocks up to 90 days) RoCE on A3 Ultra and A4 (8 ConnectX-7 NICs, 3,200 Gbps for GPU traffic), rail-aligned blocks
Oracle Hyperscaler Superclusters: orders opened in September 2024 for up to 131,072 Blackwell GPUs; Zettascale10 clusters of up to 800,000 GPUs announced for the second half of 2026 RoCEv2 or InfiniBand; Acceleron RoCE on Zettascale10
CoreWeave Neocloud, public Multi-year take-or-pay contracts with prepayments; over 98% of 2025 revenue was committed InfiniBand fat-tree with SHARP; Spectrum-X RoCE on GB300
Nebius Neocloud, public Dedicated multi-year capacity for a few large buyers (Microsoft, Meta); GPU clusters inside named fabrics InfiniBand, 400 Gbps per GPU; one partition key per cluster
Lambda Neocloud, private On-demand per GPU-hour; 1-Click Clusters of 16 to 2,000+ GPUs for two weeks to a year; reserved through sales InfiniBand-connected clusters with SHARP
Crusoe Neocloud and campus developer, private Builds and operates AI campuses; a 900 MW Abilene campus for Microsoft announced March 2026 Not detailed here
Together AI Neocloud plus inference API GPU clusters on-demand or reserved in 3 to 180-day bands; serverless inference per token Not detailed here
DigitalOcean Developer cloud GPU Droplets per second with a 5-minute minimum; reserved on 12-month contracts Not detailed here
RunPod Community and datacenter tiers Pods per hour in Community Cloud (third-party hosts) or Secure Cloud; serverless per second Not detailed here
Vast.ai Marketplace Host-set prices per offer: on-demand, reserved, or interruptible by bid Whatever the host has
Modal, Replicate, fal Serverless GPU Per GPU-second, or per output (image, second of video, megapixel) Abstracted
Cloudflare Workers AI Serverless inference "Neurons", an abstract unit, plus per-model token prices Abstracted

Four patterns run through the table:

  • The hyperscalers ration, the neoclouds contract. AWS, Google and Lambda sell time-boxed blocks because the large GPUs are too scarce to promise on demand; Azure's capacity reservations explicitly exclude its training SKUs. The neoclouds sell most of their capacity years in advance to a handful of buyers, and finance the GPUs against those contracts.
  • The fabric is bundled. None of these providers prices the InfiniBand or EFA network separately. What is sold is the instance size, the cluster or placement construct, and reserved capacity inside one fabric.
  • Capacity is now counted in power. CoreWeave and Nebius report megawatts active and gigawatts contracted rather than GPU counts, because power and cooled floor space are what limit growth.
  • The further from the metal, the more abstract the unit. A neocloud contract is GPU-years; a Capacity Block is instance-hours; a serverless platform is GPU-seconds; an inference API is tokens or images; Workers AI is Neurons; a web host's AI builder is credits.

How GPU Clouds Got Here#

Date Step Problem it solved What it cost
29 Apr 2019 AWS Elastic Fabric Adapter generally available, with OS bypass through libfabric and NCCL support Tightly coupled HPC and ML on a cloud's Ethernet A provider-specific transport (SRD) instead of InfiniBand
27 Apr 2020 NVIDIA completes its $7 billion Mellanox acquisition One vendor for GPUs, NVLink and InfiniBand Concentration of the AI fabric in one supplier
13 Mar 2023 Azure previews ND H100 v5: a 400 Gb/s InfiniBand link per GPU, 3.2 Tb/s per VM, non-blocking fat-tree Supercomputer-class networks rented by the VM VMs that can't live-migrate
26 Jul 2023 AWS P5 (8 H100s, 3,200 Gbps EFA) generally available The first H100 generation on a hyperscaler Scarcity: capacity, not price, became the constraint
6 Dec 2023 Google announces Dynamic Workload Scheduler, Flex Start and Calendar mode Rationing scarce GPUs by queue and by booked block Customers plan training runs around a calendar
12 Mar 2024 Meta describes two 24,576-GPU H100 clusters, one on RoCE and one on InfiniBand Showing Ethernet could carry training at scale Scheduler, routing and NCCL work before large clusters reached 90%+ utilization
14 Feb 2025 Fly.io, "We Were Wrong About GPUs" (A PaaS learning that developers want models, not GPUs) Months lost to virtualized GPUs in a microVM hypervisor
March 2025 CoreWeave lists on Nasdaq Public capital for a GPU-only cloud Disclosure of its concentration and debt
13 May 2025 BIS says it will not enforce the AI Diffusion Rule, due 15 May (Reversing a worldwide tiered licensing scheme) Uncertainty: no replacement rule as of October 2026
4 Jun 2024 Core Scientific signs 12-year contracts to host about 200 MW for CoreWeave, the first large miner-to-AI lease Powered sites for GPUs without building new ones Mining capacity redeployed off the converted sites
1 Jun 2025 AWS cuts on-demand GPU prices: P4d and P4de 33%, P5 44%, P5en 25%; Savings Plans up to 45% for P5 Cheaper Hopper-generation capacity as Blackwell arrived
14 Aug 2025 TeraWulf leases Lake Mariner capacity to Fluidstack with a Google backstop A hyperscaler's credit behind a smaller tenant's lease Warrants to Google in the miner's equity
8 Sep 2025 Nebius signs a five-year Microsoft capacity contract of about $17.4 billion A hyperscaler renting capacity from a neocloud Delivery dates with termination rights
30 Oct 2025 Core Scientific terminates its merger with CoreWeave after shareholders vote it down (Buying powered sites instead of leasing them)
17 Nov 2025 Cloudflare announces Replicate is joining it, with the catalog moving to Workers AI Serverless inference consolidating into an edge network
15 Jan 2026 BIS rule 91 FR 1684 moves H200 and MI325X-class exports to China to case-by-case review A licensed path to China, under volume and KYC conditions Third-party testing of every shipment, remote-access screening
Jan and Jul 2026 AWS raises Capacity Block prices: about 15% on H200 blocks in January, about 20% from 1 July Demand for Blackwell-class blocks outrunning supply Reservation buyers pay the market rate at purchase
10 Jul 2026 BIS final rule 91 FR 43034 moves the UAE to Country Group A:5 License-free advanced computing for approved UAE users

The arc is short. Until 2023 a cloud GPU was an instance type like any other; the H100 generation made accelerators the scarcest thing a cloud sells, turned reservations into the product, and created a class of provider whose whole balance sheet is GPUs pledged against customer contracts. Prices fell in 2025 as supply arrived and rose again in 2026 for the newest chips: there is no single trend, only a market that reprices each generation.

How a GPU Instance Works#

The unit is a server, not a slice. A hyperscaler GPU instance is normally a whole 8-GPU HGX board (AWS p5.48xlarge, p6-b200.48xlarge, Azure's ND H100 v5), with the GPUs joined inside the server by NVLink and NVSwitch: 900 GB/s per GPU on Hopper's NVLink 4, 1,800 GB/s on Blackwell's NVLink 5. Smaller sizes exist (AWS sells a one-H100 p5.4xlarge), but training and large-model inference rent the whole board, because the NVLink domain is the fastest network the model can use.

Rack-scale systems move the NVLink domain up a level. NVIDIA's GB200 NVL72 joins 72 Blackwell GPUs and 36 Grace CPUs in one 130 TB/s NVLink domain with 13.4 TB of HBM3E, liquid-cooled; AWS sells it as the p6e-gb200 UltraServer and Azure as ND GB200 v6, whose VM is one tray of four GPUs. The customer rents a rack, or a share of one, and the rack is the failure domain.

Every serious GPU server has two networks:

  • The back-end (scale-out) fabric carries GPU-to-GPU traffic between servers: InfiniBand on Azure ND, CoreWeave, Lambda and Nebius; RoCE on Google's A3 Ultra and A4, Oracle and Meta's RoCE cluster; EFA with SRD on AWS. The common shape is one 400 Gbps NIC per GPU (3.2 Tbps per 8-GPU server), rail-optimized so each GPU's NIC reaches the same-numbered GPU in other servers in one hop. Google's documentation describes sub-blocks one hop apart through a top-of-rack switch and blocks a maximum of two hops apart; NVIDIA's DGX SuperPOD reference uses 32-node scalable units.
  • The front-end network carries everything else: storage, checkpoints, logging, the customer's VPC. Azure's ND H100 v5 lists a separate 80,000 Mbps Ethernet front end across eight NICs; Meta's paper separates front end (ingest, checkpoint, logging) from back end (training).

Placement is where the fabric becomes a product. A training job needs its servers in the same fabric, ideally the same block, so providers sell cluster constructs: AWS EC2 UltraClusters and cluster placement groups (Capacity Blocks are placed in UltraClusters), Lambda's 1-Click Clusters, Nebius's GPU clusters. Nebius documents the mechanics most plainly: clusters live in a named fabric (fabric-2 through fabric-7), one GPU platform per fabric; a VM joins a cluster only at creation; and each cluster gets its own InfiniBand partition key (P-Key), the fabric's tenant isolation. The fabrics, their congestion control and their history are Data Center Networking's.

Isolation is the other hard part. Fly.io's account of its GPU product is the clearest public record of what goes wrong for a provider whose isolation is a microVM: GPU Machines were Docker containers in hardware-virtualized VMs with GPUs passed through, months went into failing to get virtualized GPUs working in Cloud Hypervisor, the dedicated GPU servers sat at low utilization, and the conclusion was that "developers don't want GPUs... They want LLMs"; only the L40S sold steadily. A community forum thread reports a customer notice that Fly GPUs would be deprecated as of 31 July 2026; Fly.io staff have not confirmed it on that thread. Sandboxes & MicroVMs covers the isolation layer.

Power, Cooling and the Rack#

A GPU rack is a different building load. SemiAnalysis puts an NVL72 at about 120 kW per rack, 123.6 kW total draw including AC-to-DC losses, against about 40 kW for the densest air-cooled H100 racks; Supermicro's NVL72 rack lists 132 kW total power, eight 33 kW power shelves, and an in-rack coolant distribution unit (CDU) of 250 kW or an in-row CDU of 1.3 MW, with liquid-to-air options of 180 or 240 kW for sites without facility water. Typical colocation racks are a fraction of that, which is why the move to rack-scale systems is also a move to direct-to-chip liquid cooling and to new buildings. The Data Center & Colocation owns the facility side; Where AI Runs covers what that density means for a customer putting GPUs in colocation.

For a GPU provider, power is the binding constraint and the unit of disclosure. CoreWeave reported more than 850 MW active and about 3.1 GW contracted at the end of 2025, then 1.5 GW active and about 3.7 GW contracted at the end of June 2026. Nebius raised its year-end 2026 contracted power target to 5 GW, and quotes large deals at an annual contract value of $20 to 25 million per MW. Crusoe reports over 6 GW of gross contracted capacity and 1 GW operational (September 2026). A provider's capacity plan is a power plan first and a GPU order second.

Buying Capacity#

GPU capacity is sold in six shapes, and most providers offer several:

Shape How it works Examples, as of October 2026 Who carries the idle risk
On-demand Per second or hour, no commitment, if capacity exists AWS, Azure, Google; Lambda per GPU-hour; DigitalOcean per second with a 5-minute minimum Provider
Capacity reservation Capacity held in a region or zone, billed at the on-demand rate whether used or not Azure on-demand capacity reservation, with a capacity SLA, excluding ND-series and NCads H100 v5 Customer
Time-boxed block A fixed number of instances for fixed dates, bought ahead at a price set at purchase AWS Capacity Blocks (up to six months, up to eight weeks ahead); Google DWS Calendar mode (up to 90 days); Lambda 1-Click Clusters (two weeks to a year); Together reserved bands Customer, for the block
Queued Ask for N GPUs for up to a duration; the job starts when capacity frees Google DWS Flex Start (up to seven days), used through GKE queued provisioning and Kueue Shared: the customer waits
Multi-year take-or-pay Dedicated capacity for years, prepaid in part, paid whether used or not CoreWeave (about five-year average), Nebius (Microsoft, Meta), Lambda (Microsoft) Customer
Interruptible or spot Cheaper capacity the provider can reclaim Vast.ai interruptible by bid; RunPod spot; DigitalOcean B300 spot Customer, as interruption

The mechanics that matter in each:

  • AWS Capacity Blocks reserve P6e-GB200, P6-B300, P6-B200, P5en, P5e, P5, P4d and Trainium instances, from 1 to 64 instances (up to 512 GPUs), in EC2 UltraClusters, shareable across accounts. Prices "are dynamic and change based on available supply and demand"; a block "is charged at the prevailing rate at the time of purchase," and the October 2026 page says prices are "scheduled to be updated next in January, 2027."
  • Google DWS Calendar mode reserves resources "for a duration of up to 90 days," shows availability up to 60 days ahead for GPUs (120 for TPUs), and needs a minimum lead time of 87 hours for GPU VMs. It is built on Compute Engine future reservations: at the end, the VMs are terminated and the reservation deleted.
  • Azure on-demand capacity reservations carry a capacity SLA with service credits (Microsoft's worked example: 55 minutes unavailable is 99.87% and earns a 10% credit). Reservations and Savings Plans apply on top. The training SKUs are excluded, so ND capacity is sales-led; the Retail Prices API does list one- and three-year reservation prices for ND GB200 v6.
  • Neocloud contracts are the opposite of on-demand. CoreWeave's 10-K says customers buy "a specified amount of capacity on a take-or-pay basis over the contract term," with weighted-average prepayments of 15% to 25% of total contract value. Nebius's Microsoft agreement lets Microsoft terminate a GPU service if delivery dates are missed after a grace period and no alternative capacity is offered, and its obligations started only once Nebius confirmed financing for the build. Delivery dates are the provider's risk; utilization is the customer's.
  • Marketplaces put the price in the host's hands. Vast.ai says "Pricing is set by the host and is specific to each offer," with separate charges for the rental per hour, storage per GB-hour (billed even when stopped) and bandwidth per TB. Its rental types are on-demand (the host's fixed price), reserved (prepaid, up to 50% off) and interruptible (a bid; a higher bid stops you; 50% to 80% cheaper). RunPod splits Community Cloud (third-party hosts) from Secure Cloud (data centers) at different prices for the same GPU.

The scheduling rule underneath is the same everywhere: a block or reservation is a promise against a specific pool (an instance type in a zone, inside one fabric), and the provider can only sell what that pool will have on those dates after earlier promises. That is why blocks are booked ahead with lead times, why they end hard, and why the price is fixed at purchase rather than at use.

GPU Prices, Dated#

List prices per GPU-hour, as of October 2026. Where a provider quotes per instance, the per-GPU figure is the provider's own (AWS) or my division (Azure):

GPU AWS Capacity Block, US East (N. Virginia) Azure, East US Lambda on-demand Together on-demand / 91 to 180 days DigitalOcean on-demand RunPod Community / Secure Modal (serverless)
A100 80 GB $2.546 (p4de) $2.79 $1.39 / $1.79 (SXM) about $2.50
H100 $5.970 (p5.48xlarge) $3.99 to $4.29 (SXM) $3.99 / $3.19 $4.41 $2.69 / $3.99 (SXM) about $3.95
H200 $7.895 (p5en) $5.99 / $3.99 $4.47 $3.59 / $5.29 about $4.54
B200 $14.208 (p6-b200) $6.69 to $6.99 $8.19 / $6.79 $5.98 / $7.99 about $6.25
B300 $16.146 (p6-b300) $7.94 reserved, $6.17 spot
GB200 $761.904 per UltraServer-hour (Dallas Local Zone table) $27.04 (ND GB200 v6, $108.16 per 4-GPU VM-hour) Reserved only

Notes on reading it:

  • The rows are not like for like. An AWS Capacity Block is a reserved, clustered, EFA-connected block; a Lambda on-demand GPU is a single VM; a RunPod Community GPU is a third party's machine; a Modal price is per second with no minimum (Modal lists B200 at $0.001736 and H100 at $0.001097 per second, which I convert to hours). The cluster premium shows inside one provider: Lambda's B200 is $6.69 on demand but $9.86 to $8.87 per GPU-hour in a 1-Click Cluster.
  • Azure's reservation discount is steep. ND GB200 v6 lists $108.16 an hour pay-as-you-go (Linux), a one-year reservation of $606,388 per VM (about $69.2 an hour) and a three-year reservation of $1,250,676 (about $47.6 an hour). The API lists the Spot meter at the same $108.16.
  • AWS Capacity Block rates moved up three times in 2026. H200 blocks rose about 15% in January (US West p5e/p5en from $43.26 to $49.75 per instance-hour, as reported by the press; AWS said prices "vary based on supply and demand patterns"); blocks rose about 20% from 1 July (press: P5 $5.191, P5en $6.865, P6-B200 $12.355 and P6-B300 $14.04 per accelerator-hour in the US); and the October US East table sits about 15% above those July figures. AWS has published no announcement for the July-to-October change.
  • The 2025 direction was down. AWS cut on-demand P5 prices 44% from 1 June 2025, and P4d, P4de and P5en by 33% and 25%. DigitalOcean's on-demand H100 went the other way in 2026: $3.39 per GPU-hour in an archived March 2026 copy of its pricing page, $4.41 in October; its 12-month reserved H100 went from $2.50 to $3.26.

My rule for a provider's catalog: a GPU price is a dated price version with the purchase option, the region and the cluster construct as dimensions, never a single number per GPU model. The same H100 has at least five prices at one provider, and the reservation price that applies is the one in effect when the block was bought.

The Neocloud Business#

The neoclouds are utilities financed like infrastructure projects. CoreWeave's 2025 10-K is the most complete public description:

Measure CoreWeave Source period
Revenue $5,131 million, up from $1,915 million 2025
Committed contracts as a share of revenue Over 98% (96% in 2024, 88% in 2023) 2025
Weighted-average contract duration About five years 2025
Prepayments 15% to 25% of total contract value, weighted average 2025
Largest customer "approximately 67% of our revenue from our top customer, Microsoft" 2025
Remaining performance obligations $60.7 billion, up from $15.1 billion; 43% recognized within 24 months, 38% in months 25 to 48, the rest in months 49 to 84 31 Dec 2025
Footprint 43 data centers, over 850 MW active, about 3.1 GW contracted 31 Dec 2025
Total indebtedness $21.6 billion, plus $5.2 billion of OEM and equipment financing and $8.2 billion of operating lease liabilities 31 Dec 2025
Technology equipment useful life Six years (changed from five, effective 1 January 2023) 2025
Named contracts OpenAI up to about $11.9 billion through October 2030 and a further up to about $6.5 billion through May 2031; Meta up to about $14.2 billion through December 2031 As disclosed
Quarter to 30 Jun 2026 Revenue $2,575 million; interest expense $640 million; net loss $626 million; adjusted operating income $128 million; property and equipment purchases $6,422 million; backlog about $104 billion Q2 2026

Four things in that table define the model:

  • Contracts are the collateral. The 10-K describes asset-level debt "supported by take-or-pay customer contracts," in a series of delayed-draw term loan facilities (DDTL 1.0, 2.0, 2.1 and 3.0) alongside notes, convertibles and a revolver. A neocloud's real product is a financing structure that turns a customer's five-year promise into a GPU order today.
  • Concentration is the disclosed risk. Microsoft was about 67% of CoreWeave's 2025 revenue. The 10-K's "Customer A" was 62% in 2024 and 35% in 2023, but the filing warns that the letters may denote different customers in different periods, so the 2024 figure cannot be read as Microsoft's without that caveat.
  • Interest competes with margin. In the second quarter of 2026 CoreWeave's interest expense ($640 million) was five times its adjusted operating income ($128 million). The business works if contracted revenue arrives on schedule and the GPUs earn for longer than the debt runs; depreciation over six years is a bet on the second.
  • Powered land is the scarce input. CoreWeave's attempt to buy Core Scientific, a crypto miner with powered sites, failed when Core Scientific's shareholders voted 203,451,498 against to 20,752,327 for, and Core Scientific terminated the agreement on 30 October 2025; CoreWeave remains its only colocation tenant (Miners Turned AI Landlords).

The other neoclouds show the same shape at different stages. Nebius disclosed a five-year Microsoft agreement worth about $17.4 billion through 2031 (up to about $19.4 billion with additional services) and a Meta agreement of about $3 billion over five years; in the second quarter of 2026 it reported revenue of $582.3 million, AI cloud revenue of $575 million, ARR of $3.0 billion (defined as the last month's AI cloud revenue times twelve), a 50% adjusted EBITDA margin for AI cloud, and $5,657.4 million of capital spending in the quarter, with over $9 billion of customer prepayments expected in 2026. Lambda announced a "multibillion-dollar agreement" with Microsoft on 3 November 2025 without a value or term; it has filed no public S-1 as of 27 October 2026. Crusoe, private, raised a $1.375 billion Series E at over $10 billion (24 October 2025) and a $3.9 billion Series F at $30.9 billion post-money (17 September 2026), and announced a 900 MW campus in Abilene, Texas for Microsoft next to its existing 1.2 GW site (27 March 2026).

The pattern a hyperscaler buyer creates is worth naming: Microsoft is CoreWeave's largest customer and has contracted capacity from Nebius and Lambda, so a neocloud's capacity is often a hyperscaler's capacity under another name, and its customers' customers sit on the hyperscaler's bill. Who resells whom is The Provider Landscape's map.

Miners Turned AI Landlords#

The scarcest input in the table above is powered land, and the companies that held the most of it outside the utilities and hyperscalers were bitcoin miners: hundreds of megawatts of grid connections in Texas, New York and elsewhere, bought for cheap power, at sites with no other tenant. From 2024 they started leasing those sites to AI tenants. Their own filings give the reason: Core Scientific's 2025 10-K says "the ability to secure large amounts of power capacity is often viewed as a primary bottleneck"; Riot's that "access to reliable, low-cost power has become a critical constraint on the development of new data centers"; Hut 8's that "we treat power as the first variable in platform development." How miners ran those sites as power hosts (curtailment credits, ERCOT programs, hosting other miners) is The Data Center & Colocation's.

Miner Tenant and date Critical IT Term and contract value Backstop and funding Mining at the site
Core Scientific CoreWeave; first contracts 4 Jun 2024, final option 22 Oct 2024 About 500 MW at six sites (October 2024); about 590 MW by the 2025 10-K, all licensed to CoreWeave 12 years; potential $8.7 billion at 500 MW CoreWeave funds the conversions, with part of the capex credited against hosting payments Being converted: "every megawatt in our portfolio" to high-density colocation over three years
TeraWulf Fluidstack at Lake Mariner, New York; 14 and 18 Aug 2025 About 360 MW (378 MW in the 2025 10-K) 10 years; about $6.7 billion, up to $16 billion with extensions Google backstops about $3.2 billion of Fluidstack's obligations, for warrants; $3.2 billion of secured notes Continues: 245 MW of legacy mining at the end of 2025
Cipher Fluidstack at Barber Lake, Texas, 25 Sep 2025; AWS, 3 Nov 2025 168 MW; 300 MW 10 years, about $3 billion; 15 years, about $5.5 billion, rent from August 2026 Google backstops $1.4 billion of the Fluidstack lease The AWS site's mining ramped to 150 MW and stopped in February 2026
IREN Microsoft, 3 Nov 2025 200 MW of new data halls at its 750 MW Childress, Texas campus 5 years; about $9.7 billion, 20% prepaid IREN buys the GB300 GPUs from Dell for about $5.8 billion Leaving mining by the end of 2026
Hut 8 Fluidstack at River Bend, Louisiana, 17 Dec 2025 245 MW (330 MW of utility capacity) 15 years, triple net; $7.0 billion, about $17.7 billion with renewals Google backstops lease payments; up to 85% loan-to-cost from J.P. Morgan A new campus, not a converted mine
Riot AMD at Rockdale, Texas, 16 Jan 2026; "one of the world's leading frontier AI labs," 10 Aug 2026 25 MW, with expansion options; 191 MW 10 years, about $311 million; 20 years, about $9.1 billion Not stated Rockdale's 700 MW to be converted for data center tenants
Galaxy CoreWeave at Helios, Texas; 15-year lease of 133 MW in March 2025, the full site by August 2025 526 MW (800 MW of approved gross power) 15 years; "$1B+" of expected average annual revenue Not stated Not stated

Four things in the table define the pivot:

  • Two business models, one asset. Most of these are colocation leases: the miner provides a powered, cooled building and the tenant (CoreWeave, Fluidstack, AWS) brings the GPUs. IREN is the exception, selling Microsoft GPU capacity it owns, which makes it a neocloud with a power business rather than a landlord with a power business. The difference shows in the balance sheet: IREN's $5.8 billion GPU order against a lessor's building capex.
  • A hyperscaler stands behind the tenant. Fluidstack is a smaller cloud; Google's backstops of its lease obligations at TeraWulf, Cipher and Hut 8 are what let the miners raise debt against the leases, the same contracts-as-collateral structure as the neoclouds', one layer down.
  • The terms are infrastructure terms. Ten to twenty years, triple net, renewal options, rights of first offer on expansion: these read like wholesale data center leases (How Colocation Is Sold), because that is what they are. Delivery is the risk: Core Scientific reported over 185 MW billing out of about 590 MW in March 2026, with sites completing through the first half of 2027.
  • Mining becomes the fallback. The leases replace the most volatile revenue line with the most predictable one. Core Scientific's colocation revenue in the second quarter of 2026 was $136.7 million against $21.5 million from its own mining; IREN plans to leave mining in 2026. Miners that keep mining keep it on capacity no tenant has taken yet.

The counterparties repeat. CoreWeave is the tenant at Core Scientific and Galaxy; Fluidstack, backed by Google, at TeraWulf, Cipher and Hut 8, where Hut 8's 2025 results name Anthropic and Fluidstack as partners in a program of at least 245 MW and up to 2,295 MW. A miner's tenant is often a neocloud whose own customer is a hyperscaler or a model lab, so the same concentration this chapter's neocloud section describes runs through the landlords as well.

Serverless GPU and Per-Output Pricing#

Above the machine, platforms sell GPU time in seconds or sell outputs, and the differences are in what idle time costs:

Platform Unit Example prices, as of October 2026 Idle and cold starts
Modal GPU-second, plus CPU per physical core-second and memory per GiB-second B200 $0.001736/s, H100 $0.001097/s, L4 $0.000222/s; region pinning 1.15x to 1.75x; non-preemptible 3x Billed while containers run; plans include monthly credits ($30 Starter, $100 Team)
Replicate Hardware-second, or per output for official models H100 $0.001525/s; flux-1.1-pro $0.04 per image; wan-2.1-i2v-720p $0.25 per second of video Public models bill processing time only; private models bill all online time, setup and idle included
fal Per output for its model API; GPU-hour for custom deployments FLUX.1 [schnell] $0.003 per megapixel; B200 $7.99/h list, "as low as" $5.49 Not detailed here
RunPod Serverless Per-second workers H100 about $4.79/h, B200 $8.64/h equivalents Not detailed here
Cloudflare Workers AI Neurons, $0.011 per 1,000 above 10,000 free a day, plus per-model token prices llama-3.2-1b $0.027 per million input tokens, $0.201 output Free allowance resets at 00:00 UTC
Together AI Per million tokens gpt-oss-120b $0.15 input, $0.60 output Serverless; dedicated endpoints per hour

Two lessons for anyone building one. The premium over a reserved GPU (Modal's H100 at about $3.95 an hour against Together's 91-to-180-day $3.19) pays for scale to zero; it is cheap at low utilization and expensive at high. And the meter decides who pays for the cold start: Replicate's split between public models (processing time only) and private ones (all online time) is the clearest statement of a rule every serverless GPU platform has to make. Token-priced inference across tiers, and when renting GPUs beats paying per token, is Where AI Runs.

Export Controls on Chips and Remote Access#

Advanced GPUs are export-controlled under the US Export Administration Regulations, and a GPU cloud is both an exporter (when it ships hardware to its own data centers abroad) and a channel for remote access (when a customer in a country of concern rents the chips). The status, as of October 2026:

Measure Status What it requires of a provider
AI Diffusion Rule (worldwide tiered licensing) Not enforced: BIS announced on 13 May 2025 that it would not enforce the rule due 15 May and would issue a replacement; no replacement or formal rescission in the Federal Register through 27 October 2026 Nothing new; BIS guidance warns that using certain Huawei Ascend chips risks violating the EAR, and lists diversion red flags
H200 and MI325X to China and Macau (91 FR 1684, effective 15 Jan 2026) In force: case-by-case review instead of a presumption of denial, for chips with TPP below 21,000 and total DRAM bandwidth below 6,500 GB/s Aggregate TPP shipped to China and Macau no more than 50% of the aggregate TPP shipped to US customers for US end use; consignee KYC against unauthorized remote access; every shipment reviewed by a qualified third-party lab; the applicant lists intended IaaS remote end users in the named countries of concern
UAE (91 FR 43034, published 14 Jul 2026, effective 10 Jul 2026) In force: UAE moved from Country Groups D:3 and D:4 to A:5 License-free access to advanced computing items for the UAE Government and approved commercial entities
Remote access by Chinese firms in third countries Pending: a draft Commerce rule reported in August 2026; nothing in the Federal Register as of 27 October 2026 None yet
Remote Access Security Act, H.R. 2683 Pending: passed the House 369 to 22 on 12 January 2026; in Senate Banking as of October 2026 None yet
IaaS customer identification rule (RIN 0694-AJ35) Withdrawn: proposed January 2024 (89 FR 5698), listed as withdrawn on 16 December 2025 in the Unified Agenda None under that rule

The H200 rule writes remote access into a chip license's conditions: the exporter must know its consignee's customers well enough to prevent unauthorized remote use, and must name the IaaS end users it intends to serve in countries of concern. For a provider that means export compliance reaches into the account model: which accounts in which countries use which instance types, provable later. Sanctions screening, the broader export rules and know-your-customer for infrastructure are Sanctions, Exports & Bulletproof Hosts'.

AI Inside Hosting Plans#

At the far end of the stack, web hosts sell AI as a feature of a plan, built on frontier or hosted models they don't run:

Host Product, as publicly described How it's metered
Hostinger One AI Builder combining Horizons and the website builder, with Manual (drag-and-drop) and Agentic ("vibe coding") modes and a built-in back end; "Hostinger Agent" AI support chatbot Credits: a simple page 250 to 500, a complex app 750 or more; live AI features such as chatbots also draw credits; base allowances of 250, 500 or 1,000 by plan. Expired plans' projects are permanently deleted
GoDaddy Airo, launched 26 February 2024 (a domain name from a description, logo, site, email and marketing content), extended to new and existing domain purchases in English-speaking markets by the second quarter of 2024; agentic Airo.ai in beta with six agents (13 November 2025); Airo for WordPress (11 May 2026) Included with domain purchases
Bluehost Bluehost AI Website Creator, part of WonderSuite, shown at WordCamp Europe in June 2024; Bluehost AI Website Builder (post first published 27 May 2026), whose agent asks "up to 5 guided clarifying questions" 14-day free trial, no credit card

The engineering is simple and the billing is the interesting part. A credit is a plan allowance in a unit the host defines, drawn down by actions whose model cost varies, which lets the host reprice the underlying tokens without changing the plan; the lifecycle rule (Hostinger's "permanently deleted" on expiry) matters more than usual, because the customer's site may exist only inside the builder. How hosts bundle and upsell is How Web Hosting Makes Money's.

The Alternatives#

Approach Model Strengths Failure modes Cost shape Who uses it
Hyperscaler on-demand Per second, if available Next to the customer's data, IAM and VPC; one bill The large GPUs often aren't available; highest list price Highest per hour, no commitment Inference and experiments inside an existing cloud estate
Hyperscaler block or calendar reservation Fixed dates, price set at purchase Guaranteed capacity for a training run in a known fabric Hard end date; rates rose through 2026; lead times Paid for the whole block Training runs and launches with a date
Neocloud on-demand or cluster Per GPU-hour, or two weeks to a year Lower list prices, InfiniBand clusters on request Fewer regions and managed services; data egress back to the main cloud Lower per hour, clusters at a premium AI startups, fine-tuning, research
Neocloud multi-year take-or-pay Dedicated capacity for years, partly prepaid Price and capacity certainty at scale Paid whether used or not; tied to one provider's delivery and financing Lowest per hour, largest commitment Model labs and hyperscalers
Marketplace or community Host-set prices, bid-based interruption Cheapest consumer and older GPUs Unknown hosts, interruption, data on a stranger's machine Lowest, variable Hobbyists, batch jobs that tolerate eviction
Serverless GPU Per second or per output Scale to zero, no capacity planning Cold starts; expensive at high utilization Premium per hour, zero when idle Spiky inference, image and video generation
Own GPUs Buy, colocate, depreciate Lowest cost at steady high utilization; control Power density, liquid cooling, refresh cycles, financing Capital plus colocation Steady large workloads; see Where AI Runs

My Default#

For a customer, my default is to rent the smallest commitment that guarantees the capacity the work actually needs: serverless or on-demand for inference and experiments, a time-boxed block for a training run with a date, and a multi-year contract only when utilization above roughly two thirds is already proven on rented capacity. I'd pick a neocloud cluster over a hyperscaler block when the job is pure training and the data can move, and the hyperscaler when the model serves traffic next to data and services that already live there.

For a provider building a GPU product, my default is to sell three shapes from day one (on-demand, time-boxed blocks priced at purchase, and committed contracts) from one capacity model, because each one is a promise against the same pools and overselling one starves the others. I'd treat the fabric as part of the pool rather than a feature, price every reservation as a dated price version, and build export-control screening into account and instance-type eligibility before the first large customer abroad. The tradeoff that would change it is scale: a provider that sells only to two or three labs is a contract and financing business, and should be modeled as one.

How to Build It#

The core model already has the pieces: commitments of kind 'resource' for the promise to pay for capacity, SKUs with unit 'gpu_hour', and usage_events for what ran. Regions, Zones, Cells & Quotas owns reservations: resources of kind 'capacity_reservation' with the capacity_reservations side table. A GPU block, calendar booking or capacity contract is one of those reservations; this chapter extends that table with what GPUs add (the pool and fabric, the shape, the price at purchase, the partition key), and adds the capacity pools reservations draw from, and the meters. Reservations follow the playbook's Reservations & Holds pattern for pooled inventory: a hold on a finite pool for a time range, checked atomically.

CREATE TABLE gpu_capacity_pools (        -- what can be promised: one instance type in one fabric
  id               UUID PRIMARY KEY DEFAULT uuidv7(),
  region_id        TEXT NOT NULL REFERENCES regions (id),
  zone_id          TEXT REFERENCES zones (id),
  fabric_ref       TEXT NOT NULL,         -- the scale-out domain: 'fabric-3', an UltraCluster
  instance_type    TEXT NOT NULL,         -- 'p5.48xlarge', 'nd-gb200-v6', '8x-h100-sxm'
  gpus_per_unit    SMALLINT NOT NULL CHECK (gpus_per_unit > 0),  -- 8 for a board, 72 for a rack
  units            INT NOT NULL CHECK (units >= 0),  -- installed and sellable
  valid_during     TSTZRANGE NOT NULL,    -- from energization to retirement
  UNIQUE (region_id, fabric_ref, instance_type, valid_during)
);

-- GPU blocks and contracts are capacity_reservations (Regions, Zones, Cells & Quotas),
-- extended with what a GPU reservation adds. starts_at and committed_until are that
-- table's dates; reserved_during is derived from them for the overlap check.
ALTER TABLE capacity_reservations
  ADD COLUMN pool_id          UUID REFERENCES gpu_capacity_pools (id),  -- null: not a GPU pool
  ADD COLUMN shape            TEXT,
  ADD COLUMN commitment_id    UUID REFERENCES commitments (id),  -- kind = 'resource'
  ADD COLUMN price_version_id UUID REFERENCES price_versions (id), -- the price at purchase
  ADD COLUMN purchased_at     TIMESTAMPTZ,
  ADD COLUMN partition_key    TEXT,       -- fabric tenant isolation, e.g. an InfiniBand P-Key
  ADD COLUMN end_action       TEXT,
  ADD COLUMN reserved_during  TSTZRANGE GENERATED ALWAYS AS
                                (tstzrange(starts_at, committed_until)) STORED,
  -- NOT VALID: new rows checked now; validate after any backfill, without blocking writes
  ADD CONSTRAINT capacity_reservations_gpu_pool
    CHECK (pool_id IS NULL OR (shape IS NOT NULL AND price_version_id IS NOT NULL
                               AND purchased_at IS NOT NULL AND end_action IS NOT NULL)) NOT VALID,
  ADD CONSTRAINT capacity_reservations_contract_commitment
    CHECK ((shape = 'contract') = (commitment_id IS NOT NULL)) NOT VALID,
  ADD CONSTRAINT capacity_reservations_shape_check
    CHECK (shape IN ('capacity_reservation', 'block', 'calendar', 'queued', 'contract')) NOT VALID,
  ADD CONSTRAINT capacity_reservations_end_action_check
    CHECK (end_action IN ('terminate', 'convert_on_demand')) NOT VALID;
-- The states 'queued' and 'undelivered' are in that table's state list.
-- quantity counts instances (units of gpus_per_unit GPUs) for a GPU pool.

-- Placement: instances launched inside a reservation point at it.
ALTER TABLE virtual_machines
  ADD COLUMN capacity_reservation_id UUID REFERENCES resources (id);  -- kind = 'capacity_reservation'

Selling a block is a check against everything already promised from the pool over the same dates, run under a lock on the pool row so two sales can't both take the last units (Preventing Double-Booking):

-- Units still free in a pool for a requested window. The pool row is locked FOR UPDATE
-- first. Overlap peaks at some reservation's start, so checking each start is enough.
WITH held AS (
  SELECT quantity AS units, reserved_during
  FROM capacity_reservations
  WHERE pool_id = :pool_id
    AND state IN ('scheduled', 'active')
    AND reserved_during && :window
), points AS (
  SELECT lower(:window) AS t
  UNION
  SELECT lower(reserved_during) FROM held WHERE lower(reserved_during) <@ :window
)
SELECT p.units - COALESCE(MAX(load.units_held), 0) AS units_free
FROM gpu_capacity_pools p
LEFT JOIN LATERAL (
  SELECT pt.t, SUM(h.units) AS units_held
  FROM points pt
  JOIN held h ON h.reserved_during @> pt.t
  GROUP BY pt.t
) load ON TRUE
WHERE p.id = :pool_id
GROUP BY p.units;

The meters are usage_events.meter values rated by core SKUs:

Meter Unit SKU example Notes
gpu.instance_seconds second gpu.p5-48xlarge.on_demand.second Dimensions: purchase option, reservation id; usage inside a block rates at zero against it
gpu.reservation_hours gpu_hour gpu.block.h200.us-east.gpu_hour Emitted for the whole reserved range, used or not; the price version is the one at purchase
gpu.serverless_seconds second gpu.serverless.h100.second Per running container; whether idle counts is a SKU property
inference.outputs image, video_second, megapixel inference.flux-pro.image Per-output models; quantity per output unit
inference.abstract_units neuron workers-ai.neuron.thousand Included daily allowance on the plan version
ai_builder.credits credit hosting.ai-builder.credit Drawn from plan_versions.included; never cash

Notes on the sketch:

  • A pool is an instance type inside one fabric, because a reservation that spans fabrics can't run one job. fabric_ref is what makes a block of 64 instances a cluster rather than 64 machines.
  • The price is fixed at purchase. price_version_id is chosen when the block is bought, so a later rate change (AWS's 2026 increases) never reprices a block already sold, and a dispute can be answered with the rate card in effect on the purchase date.
  • Undelivered is a state. A contract whose capacity didn't arrive on its delivery date (the clause in Nebius's Microsoft agreement) is undelivered, which drives credits or termination rights under SLAs & Service Credits; capacity SLA credits on reservations are credit_grants of kind 'sla'.
  • Export eligibility is data. Which instance types an account may hold, by country, is a quotas row with source = 'risk' (zero for a restricted country and instance type), set by the screening process that Sanctions, Exports & Bulletproof Hosts owns, so a licence condition can be proved from the records.
  • Events: capacity_reservation.activated and capacity_reservation.failed (the Regions chapter's), plus capacity_reservation.purchased, capacity_reservation.ending_soon, capacity_reservation.ended and capacity_reservation.undelivered for GPU pools, go through the outbox, because a block that ends terminates its instances and the customer needs the warning before their checkpoint window.

Auditing#

  • Every reservation and its price. Pool, units, dates, the price version and purchase time, so an invoice for a block is traceable to the rate card on the day it was bought, not the day it ran.
  • Delivery against contract. Delivery dates promised, units energized, and any undelivered periods, because termination rights and credits depend on them, and lenders and auditors read them as revenue risk.
  • Who used which accelerators from where. Account country, instance type and the time range of every GPU instance, so the remote-access conditions of an export licence can be shown to have been met.
  • Isolation assignments. Which fabric partition each cluster held and when, because a tenant-isolation question about a shared fabric is answered from that history.

What This Means for the System You Build#

  • Model GPU capacity as pools inside a fabric, and sell every shape (on-demand, blocks, contracts) against the same pools.
  • Fix reservation prices at purchase as dated price versions with region, purchase option and cluster as dimensions.
  • Bill reservations for the whole reserved range, used or not, and rate instance usage inside them at zero.
  • Make block ends hard and announced, with events early enough for customers to checkpoint.
  • Record delivery against contract for committed capacity, with undelivered as a state that drives credits.
  • Decide who pays for idle and cold starts as a SKU property, not a code path.
  • Treat export eligibility as account data: country, instance type and remote end user, provable later.
  • Report capacity in power as well as GPUs, because megawatts are what limit what you can sell next year.

References#

Filings

Provider pricing and documentation

Engineering

Regulation