Zero-Downtime Migrations

Changing a live schema without downtime: the expand and contract pattern, safe backfills, lock-aware DDL, and the order to ship code and migrations in.

4 min readUpdated

During a deploy, old and new versions of the code run against the same database at the same time: for seconds with a rolling deploy, longer with a canary, and indefinitely if you roll back. Every migration has to work with both. That one constraint rules out most "simple" changes, like renaming a column in a single step, and it's why schema changes deserve their own discipline.

A maintenance window avoids the problem by taking the product down, which means scheduling around traffic and batching changes into risky releases. With continuous deployment there's no window to schedule into, so migrations have to be safe on a live system.

Expand and Contract#

Every breaking schema change is split into steps that are each backward compatible, a pattern also known as parallel change:

  1. Expand. Add the new structure alongside the old one. Nothing reads it yet.
  2. Write both. Deploy code that writes to the old and the new.
  3. Backfill. Copy existing data into the new structure.
  4. Read new. Deploy code that reads from the new structure.
  5. Stop writing old. Deploy code that no longer touches the old structure.
  6. Contract. Drop the old structure.

Each step is its own deploy, and each can be rolled back without undoing the one before. At no point is there a version of the code the current schema can't serve. It costs more deploys than a one-shot change, and in exchange none of them can take the site down.

Example: Renaming a Column

Renaming users.name to users.full_name:

-- 1. Expand
ALTER TABLE users ADD COLUMN full_name TEXT;

-- 3. Backfill, one batch at a time until no rows are left (see below)
UPDATE users SET full_name = name
WHERE id IN (SELECT id FROM users WHERE full_name IS NULL LIMIT 1000);

-- 6. Contract, once no code reads or writes "name"
ALTER TABLE users DROP COLUMN name;

A single ALTER TABLE users RENAME COLUMN takes effect instantly, and every old instance still running fails on its next query until it's replaced.

NOTES: (UNLESS OTHERWISE SPECIFIED) 1 OLD AND NEW CODE SHARE ONE SCHEMA DURING EVERY DEPLOY, SO EACH STEP HAS TO WORK WITH THE CODE BEFORE IT. 2 RESUMABLE, KEYED ON WHERE FULL_NAME IS NULL; COUNT THE ROWS THAT STILL DIFFER, AND CONTRACT ONLY AT ZERO. 3 THE DROP SHIPS ALONE, AT LEAST ONE DEPLOY CYCLE AFTER D5 REMOVED THE LAST CODE THAT TOUCHED NAME. 4 EACH DEPLOY RUNS ON THE SCHEMA THE DEPLOY BEFORE IT LEFT BEHIND, SO ANY DEPLOY ROLLS BACK TO THE ONE BEFORE IT. NOT TO SCALE: ONE DEPLOY PER STEP, EVENLY SPACED. SCHEMA CHANGES, READS AND WRITES ARE IN THE TABLE. d1 d2 d3 d4 d5 d6 1 NAME READ + WRITE WRITE ONLY UNUSED FULL_NAME UNUSED WRITE ONLY READ + WRITE BACKFILL BATCHED JOB 2 W1 3 PLAN VIEW · RENAMING USERS.NAME TO FULL_NAME NOT TO SCALE · TIMELINE · ONE DEPLOY PER STEP 4 STEPS · FROM THE CHAPTER'S RENAME EXAMPLE CODE STEP SCHEMA OR DATA READS WRITES d1 expand ADD COLUMN full_name name name d2 write both none name both d3 backfill UPDATE in batches of 1,000 name both d4 read new none full_name both d5 stop writing old none full_name full_name W1 wait at least 1 deploy cycle full_name full_name d6 contract DROP COLUMN name full_name full_name Dimensional timeline of the rename from users.name to users.full_name over six deploys. The name column is read and written until d4, written only until d5, and unused until d6 drops it. The full_name column is added empty at d1, written from d2, filled by a batched backfill job from d3, and read and written from d4 on. A dimension marks at least one deploy cycle between d5 and the drop at d6, and a table lists each step's schema change, reads and writes.
Six deploys, each one compatible with the one before it, so any of them can roll back; only the drop is irreversible, and it ships last and alone.

Backfills#

  • Batch it. Hundreds to low thousands of rows per batch, each in its own transaction, with a short pause between. One UPDATE across 50 million rows holds row locks for its whole duration, floods replicas with write-ahead log, and leaves a table full of dead tuples for vacuum.
  • Make it resumable. Key off WHERE new_column IS NULL or an ID cursor, so a backfill interrupted at 60% resumes at 60%, not zero.
  • Run it as a job, not a migration. Schema migrations should finish in seconds, inside the deploy. Data work that takes hours runs separately, with progress you can watch and a way to pause it.
  • Verify before you contract. Count the rows that still differ; drop only at zero. Dropping a column with data you didn't copy is the one step here you can't roll back.

Lock-Aware DDL#

Some DDL takes an ACCESS EXCLUSIVE lock that blocks every read and write on the table while it runs, so a statement that's instant in development can stall production for minutes. On Postgres:

Change Safe approach
Add an index CREATE INDEX CONCURRENTLY (slower, and can't run in a transaction, but doesn't block writes)
Add a foreign key ADD CONSTRAINT ... NOT VALID, then VALIDATE CONSTRAINT separately
Add a CHECK The same: ADD CONSTRAINT ... CHECK (...) NOT VALID, then validate. A CHECK written inline on a new column scans the whole table too; an inline REFERENCES on a new column doesn't, because every value is null
Add a unique constraint CREATE UNIQUE INDEX CONCURRENTLY, then ADD CONSTRAINT ... UNIQUE USING INDEX, which attaches the finished index. To widen a key, build the new index first and swap the constraint in one ALTER, so the old key holds until the new one does
Add an exclusion constraint No safe form: NOT VALID covers only foreign keys, CHECK and not-null, and USING INDEX only unique and primary keys. Add it while the table is small, or in a maintenance window
Add NOT NULL Add a CHECK (col IS NOT NULL) NOT VALID, validate it, then SET NOT NULL, which skips the table scan once a valid check proves there are no nulls. Postgres 18 can also add the NOT NULL constraint itself as NOT VALID: ADD CONSTRAINT t_c_not_null NOT NULL c NOT VALID, then VALIDATE CONSTRAINT after the backfill
Add a column with a default Safe on Postgres 11+ when the default is non-volatile: it's stored as metadata, not written to every row
Change a column's type Usually rewrites the table. Use expand and contract with a new column

NOT VALID is the general trick: add the constraint for new rows immediately, under a brief lock, and validate existing rows later under a lock that doesn't block writes.

Set a lock_timeout of a few seconds on migration sessions. The dangerous case isn't the DDL itself; it's DDL waiting for a lock behind one long-running query, while every other query on the table queues behind it, so a 10-second report becomes a site-wide stall. With a timeout, the migration fails fast and retries instead.

Shipping Order#

  • Migrations run before the code that needs them, as their own pipeline step, so the expanded schema is in place before any code relies on it.
  • No deploy depends on migration and code landing at the same instant. Either can be ahead of the other and nothing breaks, which is what makes the deploy safe to roll back.
  • Destructive steps ship last and alone. A DROP is never bundled with other changes, and waits at least one full deploy cycle after the last code that used the column, so a rollback never lands on code that expects a column that's gone.

Financial Tables#

On ledger and payment tables the bar is higher. Backfills never modify existing financial rows in place: those rows are append-only, and an in-place backfill is exactly the untraceable edit the ledger exists to prevent. New derived columns are filled from the history, and reconciliation runs before and after to prove no balance changed.